+ Reply to Thread
Results 1 to 4 of 4
  1. #1
    Join Date
    Mar 2002
    Location
    Chaguanas, Trinidad
    Posts
    8

    backup timetable scheduling differences

    How would a small business backup timetable schedule differ to a large business backup timetable schedule?

  2. #2
    Join Date
    Feb 2000
    Location
    26.03°N 80.14°W
    Posts
    9,410

    Frequency of backups.
    Vernon Frazee, Microsoft MVP (Windows - Shell/User)

    Defenses Up!
    Tip: When prompted for a password, give an incorrect one first. A phishing site will accept it; a legitimate one won't.


    Inside Spyware: A Guide to Finding, Removing and Preventing Online Pests


    If you don't keep up with security fixes, your computer|network won't be yours for long.

  3. #3
    Join Date
    May 2001
    Location
    Eastern US
    Posts
    484
    The backup schedule should be determined by the frequency of data change on the server, the importance of the data, and how far back in time the company is willing to go (how much data they are willing to potentially lose) should a restore be required.

    The size of the company should not be a factor - a small company that creates or modifies a lot of data every day such as recievables could easily require the same backup schedule as a large company; the only difference would be the number of servers that they would be backing up.

    ------------------
    Experience: Something you don't get until 10 minutes after you needed it.
    Experience: Something you don't get until 10 minutes after you needed it.

  4. #4
    Join Date
    Jul 2001
    Posts
    880
    Adding to what mfutty said, another variable here is your network bandwith, or hardware setup of your backup gear to the amount of data that will need to be backed up. Presently we're running a 100Mb network and my Exchange server has so many mailboxes to backup that it takes close to 26hours to perform one full backup of all mailboxes at the brick level. This can cut into time of other jobs without proper planning i.e. redundant servers, backup jobs etc... Planning is everything when a restore determines whether or not you'll be with the company tomorrow.

    ------------------
    Systems Administrator
    A+, Net+, i-Net+, CIW-A
    MCP/2K, MCP+I, MCSE/NT4

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

     

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts